Woodwright Syllabus

 

Day 1

  • Rules and Expectations

  • Safety

  • Schedule

  • Communication

  • ‘For Your Consideration’ (Service Projects, youth activities)

  • Homework (present BEFORE the project)

  • Precut CNC Project

    • Gives the students a smaller project that uses similar joints and assembly techniques as the larger kayak project.

 

Day 3

  • Project Follow up

    • Wood Sign (finalize and load to VinylMaster)

    • Toy design (as needed)

Day 2

  • Revisit the Precut CNC Project

    • What did we learn?

    • What should we watch out for?

  • Introduce the kayak

    • Process

    • Glue up of panels

  • Introduce Project 1 and 2

    • Wood Sign (logo)

    • Toy design (design and draw plans)

 

Day 5

  • Project Follow Up

    • Toy design (as needed)

    • Project 3 (FYC)

      • Toolbox

        • service hours: Pinewood Derby Carriers (small toolbox)

    • Continue Merit Badge SP (Birdhouse or Table Top)

Day 4

  • Project Follow Up

    • Wood Sign (paint and finish your sign)

    • Toy design (as needed)

  • Introduce Project 3 (FYC)

    • Toolbox

      • service hours: Pinewood Derby Carriers (small toolbox)

    • Introduce Merit Badge SP (Birdhouse or Table Top)

 

Day 6

  • Project Follow Up

    • Toy design (as needed)

    • Project 3 (FYC)

      • Toolbox

    • Complete Merit Badge SP (Birdhouse or Table Top)